HUNGERFORD

Escape of Water

After detection of a water leak under the cement screed of the swimming pool we were given the instructions were to thoroughly protect the site before removing a huge area of floor tiles, screed and insulation, as well as 1m of wall plaster to leave ready for reinstatement. The whole pool house was excavated and removed from site within three days with a team of six. This was no small feat, as it was five full, six yard skips to remove from site with a 40 metre stroll between site and skip!